Our Services

Specialist civil works across five core disciplines — each delivered to the highest technical standards.

Serving: Kalyan · Dombivli · Thane · Navi Mumbai · and other suburbs of Mumbai

Bituminous / Asphalt Road Works

Smooth, durable asphalt surfaces built to IRC specifications

Standards

IRC:29IRC:37IRC:SP:53MoRTH Specifications 5th Revision

We execute full-depth bituminous road construction from subgrade preparation to finished wearing course. Our teams are experienced in laying Dense Bituminous Macadam (DBM), Bituminous Concrete (BC), and Semi-Dense Bituminous Concrete (SDBC) using approved plant-mix operations with precise temperature and compaction control.

Scope of Work

  • Subgrade preparation and compaction (CBR-tested)
  • Granular sub-base (GSB) and Water Bound Macadam (WBM)
  • Dense Bituminous Macadam (DBM) base course
  • Bituminous Concrete (BC) wearing course
  • Prime coat and tack coat application
  • Road markings, kerbing, and edge finishing
  • Stormwater drainage integration

Key Materials

  • VG-30 / VG-40 Bitumen
  • Crushed stone aggregate (IS 2386)
  • Cationic bitumen emulsion (CRS-1)
  • Anti-stripping agents

Concrete Road Works

Rigid pavements engineered for heavy traffic and longevity

Standards

IRC:58IS:456IS:516MoRTH Section 600

Our concrete road division specialises in Pavement Quality Concrete (PQC) and Dry Lean Concrete (DLC) sub-base construction for arterial roads, internal township roads, and industrial yard pavements. We use slip-form paving techniques for high-volume stretches and fixed-form methods for tighter areas.

Scope of Work

  • Dry Lean Concrete (DLC) sub-base layer
  • Pavement Quality Concrete (PQC) surface slab
  • Dowel bar and tie bar installation
  • Expansion and contraction joint cutting and sealing
  • Texturing and curing compound application
  • Concrete batching plant management
  • In-situ cube and beam testing per IS:516

Key Materials

  • OPC 53-grade cement (IS:8112)
  • Processed graded aggregates
  • Polypropylene fibres
  • Debonding layer (LDPE film)
  • Joint sealant compound

RCC Drainage Systems

Efficient stormwater management through engineered concrete drains

Standards

IS:456IS:458IRC:SP:50CPHEEO Manual on Stormwater Drainage

Proper drainage is the backbone of any long-lasting road or township. Our drainage division designs and constructs RCC box drains and U-shaped drains. We handle full scope from survey, layout, excavation, shuttering, reinforcement, concreting, to backfilling and surface restoration.

Scope of Work

  • Stormwater runoff channel design and layout
  • RCC box drain construction (cast-in-situ)
  • Inlet and outlet structure works
  • Backfilling and surface reinstatement

Key Materials

  • M20/M25 concrete (IS:456)
  • TMT Fe-500 steel reinforcement
  • Precast RCC elements (IS:458)
  • PVC / HDPE drainage pipes
  • Waterproofing admixtures

Sports Court Construction

Professional-grade surfaces for basketball, tennis, and multi-sport use

Standards

FIBA Court StandardsITF Court Pace RatingIS:456 for base slab

We construct outdoor and covered sports courts for residential townships, schools, and commercial complexes. Our courts are built on properly compacted sub-bases with accurate dimensional layouts, appropriate surface coatings, and line markings.

Scope of Work

  • Subgrade levelling and compaction
  • DLC / PCC base course construction
  • Basketball court layout per FIBA standards
  • Tennis court layout per ITF standards
  • Multi-purpose court demarcation
  • Net post foundations and fencing

Key Materials

  • PCC M20 base slab
  • UV-resistant line paint
  • Galvanised net post assemblies

Site Development Works

Complete site preparation and finishing for residential and commercial projects

Standards

IS:1200 for earthwork measurementIS:5758 for kerbsIS:15658 for paving blocksNBC 2016 site development guidelines

Site development is where infrastructure starts. We handle the full scope of preparatory and finishing civil works — from initial earthwork and grading to final paving and landscaping infrastructure. Our teams work closely with project developers from the early stages to ensure proper utility coordination and finished quality.

Scope of Work

  • Bulk earthwork — cut, fill, and grading
  • Compaction testing and certification
  • Compound wall and boundary works
  • Kerb stone and edge restraint installation
  • Interlocking concrete paver (ICP) works
  • Surface drainage and soak pits
  • Retaining wall construction
  • External lighting foundation works
  • Landscaping civil works (pathways, planters)

Key Materials

  • Selected fill material (Zone II/III)
  • RCC M15/M20 for foundations
  • Concrete kerb blocks (IS:5758)
  • Interlocking pavers (IS:15658)
  • Geotextile fabric for drainage layers

Need a Custom Solution?

Our team can scope, estimate, and deliver civil works tailored to your project timeline and budget.

Request a Quote